RFQ GUIDE

A Buyer-Ready Checklist Before Sending Drawings

Structure your RFQ so engineering can review manufacturability, material, finish, quantity and inspection needs with fewer clarification cycles.

Must-have RFQ inputs

Include these with the first submission so manufacturability review can start without a clarification loop.

  • Drawings

    PDF with revision control, plus STEP, STP, IGES or DWG when available. ZIP is fine for multi-file sets.

    PDF, STEP, STP, IGES, DWG, ZIP

  • Material and finish

    Grade, temper or condition, plus plating, passivation, anodizing, heat treatment and masking callouts.

  • Quantity plan

    Prototype or pilot quantity, first release and estimated annual volume for process planning.

  • Critical tolerances

    Datums, threads, bores, concentricity, cosmetic faces and assembly-critical features marked on the print.

  • Application context

    Industry, mating parts, environment and packaging needs. Optional, but it speeds route selection.

  • Inspection needs

    FAI, dimensional reports, material certificates or other release documents required by your quality system.

READY Send a complete RFQ

Use the live form when drawings, material, quantity and inspection notes are ready.

Send RFQ

Please complete the security check.